GDS was appointed to undertake the design and specification for replacement of the external glazing system to the emergency stairwell and of the balcony screens to the flats.
GDS acted as lead designer and provided design for all aspects of the installation including liaison with Planning, Building Control and the Fire Authority.
GDS was appointed to undertake the planning application; prepare works specifications and drawings for the tender packages and act as Contract Administrator.
GDS performed the role of at Principal Designer under the Construction (Design and Management) Regulations 2015.